Loading...
Loading...
Browse our services, roles, and resources at a glance.
Manufacturing operators fight on three fronts: shop-floor data hygiene, multi-location finance complexity, and quality-compliance reporting. AB7 staffs all three from a single accountable contract.
Manufacturing isn't a tech problem. It's a back-office problem disguised as a tech problem.
Manufacturing operators fight on three fronts: shop-floor data hygiene, multi-location finance complexity, and quality-compliance reporting. AB7 staffs all three from a single accountable contract.
We'll map your specific manufacturing & industrial ops gaps to the bench AB7 can deploy in 7–14 days.
Book the briefingWhat we hear from manufacturing & industrialoperators isn't a strategy gap — it's an execution gap. The roadmap is fine. The spreadsheet is fine. What's missing is the bench required to actually run it. That's what we built AB7 for.
Below: the five fires we keep finding inside this category. Each one maps cleanly to one of AB7's six service pillars — which is the point of the rest of this brief.
“Most manufacturing & industrialbuyers don't need more advice — they need staffed seats.”
Inter-company eliminations, BOM cost rollups, multi-currency, multi-location P&L — under-resourced finance teams take 12+ days to close. Senior accountants with manufacturing experience cut this to 3-5 days.
ISO 9001, FDA, EPA documentation behind by months. Compliance specialists own audit-ready records continuously, not just before audits.
SAP / NetSuite / Microsoft Dynamics ERPs fall out of date. BOMs wrong, vendor master polluted, item-master duplicated. ERP admins keep data clean as a daily ops layer.
Production managers building Excel reports every week instead of running operations. Power BI / Tableau analysts automate the reporting.
Vendor onboarding, PO management, AP matching consumes procurement bandwidth. AR/AP specialists + procurement coordinators offload it.
One MSA covers all six. Add or drop pillars without re-papering the engagement.
Close in 5 days, multi-location P&L visibility
Continuous data hygiene + audit-ready records
Clean ERP data + automated production dashboards
Pipeline coverage + dealer enablement + people ops
OT cybersecurity + audit readiness
Hire engineers, ops, finance with industry context
A typical Manufacturing & Industrial engagement opens with 2–3 seats and expands. All seats sit under a single MSA.
Indicative monthly rates. Final pricing varies by seniority, geography (India / Philippines) and shape. Add headcount any time without re-papering the MSA.
Outcomes tracked weekly inside your shared dashboard — not promised in a deck.
The first 14 days are setup and absorption. Real movement on metrics begins around Day 30. By Day 90, the bench is steady-state and you're measuring outcomes — not the engagement.
Most manufacturing & industrial operators recoup setup cost by Day 60 from a combination of savings + uplift on the metrics below.
Month-end close cut from 12 days → 5 days via dedicated multi-location accountant
ERP data integrity restored — BOM, item-master, vendor-master cleaned weekly
Production KPI dashboards live (revenue, OEE, scrap, throughput) — auto-refresh
ISO 9001 / FDA audit-ready continuously, not pre-audit scramble
60-70% cost savings vs fully-loaded US local manufacturing-finance hires
No surprises at audit time. We sign your DPA, follow your stack, document everything in your dashboard.
We don't sell, resell, or distribute these platforms. Our remote staff operate on your existing accounts under your governance. All trademarks belong to their respective owners.
A composite drawn from real Manufacturing & Industrial deployments. Names redacted, structure intact.
PE-backed Australian manufacturer's monthly board pack took 9 days. No real-time KPI dashboards. Multi-plant inter-company eliminations done manually in Excel.
AB7 placed FP&A analyst (Power BI + NetSuite expert) + multi-location senior accountant. Full AEDT overlap. NetSuite admin support added.
Board pack 9 → 2 days. 6 live dashboards (revenue, cash, AR, COGS, EBITDA, headcount). Audit-ready continuously.
One MSA. Six pillars. A bench that already speaks manufacturing & industrial. Your first hire goes live in 7–14 days.